Help build the dream with us!
We believe that art inspires, and that inspiration builds community.
PHASE 1 – completed to date $335,931.25
- Open space converted to theater proscenium stage on the west wall.
- Raise open space floor with insulated concrete floor.
- Install studs, insulate and drywall interior walls of exterior rooms.
- Convert existing HVAC system to natural gas.
- New/remodeled electrical systems with a grid for stage lighting
- Use donated platforms to create a raised stage with wings.
- Convert existing exterior rooms to ADA-compliant restrooms, washer/dryer room, meeting room, kitchen, main/box office, sound and light storage, costume prep and storage.
- Create green room space behind the stage in an unheated area.
- Create separate locked area for tool and equipment storage.
- Build unheated addition on the north side for storage of props, additional platforms, set construction materials, and flats.
- New roof for main building and exterior rooms.
- 4” insulation and stucco on the main building
- Exterior painting and new mural on exterior rooms.
- Purchase 150 chairs for theater use
- Cleaned up creek area and west backlot, and installed chain link fencing.
GETTING READY FOR PHASE 2 - THE NEXT STAGE
- Includes new lobby with box office, concession area, patron restrooms, and a new community meeting space.