Our Progress So Far....

PHASE 1 – completed to date $335,931.25

  • Open space converted to theater proscenium stage on the west wall.
  • Raise open space floor with insulated concrete floor.
  • Install studs, insulate and drywall interior walls of exterior rooms.
  • Convert existing HVAC system to natural gas.
  • New/remodeled electrical systems with a grid for stage lighting
  • Use donated platforms to create a raised stage with wings.
  • Convert existing exterior rooms to ADA-compliant restrooms, washer/dryer room, meeting room, kitchen, main/box office, sound and light storage, costume prep and storage.
  • Create green room space behind the stage in an unheated area. 
  • Create separate locked area for tool and equipment storage.
  • Build unheated addition on the north side for storage of props, additional platforms, set construction materials, and flats.
  • New roof for main building and exterior rooms.
  • 4” insulation and stucco on the main building
  • Exterior painting and new mural on exterior rooms.
  • Purchase 150 chairs for theater use
  • Cleaned up creek area and west backlot, and installed chain link fencing. 


GETTING READY FOR PHASE 2 - THE NEXT STAGE

  • Includes new lobby with box office, concession area, patron restrooms, and a new community meeting space.